Zinc and standing seam for steep, snowy roofs

A zinc or standing seam roof is the cleanest line you can put on a gable. We form it on site and detail it so snow leaves where you decide.

A gray standing seam metal roof with a dormer window and a vent pipe

What we install

Three ways to a metal roof

  • Zinc standing seam

    Matte blue-gray that builds its own protective layer.

    • Cut and formed on site

    • Seamed on a ventilated deck

  • Steel and aluminum standing seam

    Factory-finished panels in a range of colors, on the same detailing.

    • Dark, light or bronze finishes

    • Rolled ridge cap and hidden fasteners

  • Snow retention

    Guards, rails and cleats placed on the plan, never added after the first winter.

    • Over entries, decks and drives

    • Clamped, not drilled, through the seam

Details

Detailed for the winter that follows

Why a metal roof here is drawn around snow first.

  • A deck that breathes

    A ventilated deck keeps the roof cold, so snow melts slowly and ice stays off the eave.

  • Zinc patina

    Zinc starts bright and settles to a matte gray. Scratches fade as it weathers.

  • Thermal movement

    Floating clips let panels expand and contract without noise or stress.

  • Penetrations

    Every vent, flue and skylight is flashed to a drawn detail, not caulked.

Settled on paper

What we settle first

Three things we put on paper before the order.

  1. 01

    Where snow goes

    Which slopes shed and which hold, marked on the plan.

  2. 02

    The ridge and hips

    Cap profile, vent and how the panels end.

  3. 03

    Every penetration

    Flue, vent, skylight and antenna mount, each with its flashing.

How the job runs

Day by day on your roof

  1. 01

    Step 1: Day 1: dry-in

    Old roof off, deck checked and ice barrier laid.

  2. 02

    Step 2: Days 2 to 4: panels formed and set

    Roll-formed at the property, clipped and seamed in the day's order.

  3. 03

    Step 3: Next: ridge, hips and penetrations

    Details cut, folded and sealed to the drawing.

  4. 04

    Step 4: Last: snow retention and walk-through

    Guards set and checked against the plan, with a photo record.

The bid

What the price depends on

We don't post prices. A roof like this is priced from its drawings, and each of these shows on the written bid.

  • Roof area and pitch

    Squares, slope and how many planes meet.

  • Metal and finish

    Zinc, steel or aluminum, and the color system.

  • Snow retention

    Guards, rails and where they go.

  • Deck and ventilation

    What sits under the metal and how it breathes.

  • Penetrations and details

    Skylights, flues, dormers and snow-country detailing.

  • Access and season

    Crane or lift, haul distance and the weather window.

Questions

Questions about zinc and standing seam

How long does zinc last?

Makers quote 80 years or more for zinc in the right conditions. Ask for the maker's data sheet, and we include it with the bid.

How do you control snow sliding off a metal roof?

Snow guards or rails, placed on the plan over the places snow would hurt: entries, decks, drives and the roofs below.

Does a metal roof attract lightning?

No. A metal roof doesn't raise the odds of a strike, and it can spread a strike's energy more safely. A lightning protection system is a separate trade.

Can we see a sample?

Yes. We bring panel samples to the site visit and to your architect or design review board.

Ask for a metal roof bid

Send a drawing, a photo or the address. We answer on the next business day.